Referring to earlier aborted deal, the document said Dassault was required to undertake necessary contractual obligation for 126 aircraft (18 direct flyaway and 108 aircraft manufactured in India) as per request for proposal requirements and contractual issues with HAL on manufacturing of 108 jets in India could not be resolved.
from Times of India https://ift.tt/2QCCvfs
Post Top Ad
Monday, November 12, 2018
Rafale deal: In SC, Centre explains why HAL failed as offset partner
Tags
# IFTTT
# Times of India
About Unknown
Templatesyard is a blogger resources site is a provider of high quality blogger template with premium looking layout and robust design. The main mission of templatesyard is to provide the best quality blogger templates.
Times of India
Labels:
IFTTT,
Times of India
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment